Overlay Underfloor Heating – Warmth Without Major Renovations

Perfect for retrofits and renovations, our overlay panels allow underfloor heating to be fitted with minimal floor height build-up and no messy excavation.

Get a free quote

What is an overlay system?

Overlay systems are slim boards that sit directly on top of your existing floor. Pipes are laid into pre-routed channels within the panels, then your chosen floor finish goes on top. With build-ups as low as 18mm, overlay is ideal when you can’t mill into concrete or don’t want the disruption of digging out floors.

When to use overlay:

  • Timber floors or surfaces not suitable for milling

  • Where minimal floor height build-up is required

  • Renovations where speed and low disruption are key

  • Upstairs floors / bathrooms

  • Properties where concrete milling is not an option

Scenic view of mountains, green hills, and a body of water under a cloudy sky.

How Installation Works

Step one: Preparation

Floors are checked for level and cleaned.

Step two: Panel Laying

Slim overlay boards are fixed directly on top of your existing floor.

Step three: Pipe Installation

Heating pipes are pressed into the pre-cut channels.

Step four: Connections

Pipes connect back to a manifold and your heating system.

Step five: Floor Finishes

Tiles, engineered wood, carpet, or vinyl can be laid over the boards.

Step six: Commissioning

The system is pressure-tested and thermostats are installed.

Which overlay system is best for you?

Screed

Add your pricing strategy. Be sure to include important details like value, length of service, and why it’s unique.

Book

Panels

Add your pricing strategy. Be sure to include important details like value, length of service, and why it’s unique.

Book

What are the advantages of overlay systems?

Milling

None

Concrete or screed floors wowwwwwww

Very low

1–2 days typical wwww

Laid on existing floor

Feature

Floor build-up:

Best for: wowowowwowow

Disruption:

Installation speed:

Floor finish:

Overlay

18-22mm

Timber floors, upstairs, sensitive areas

Very low

1–2 days typical www

Laid over panels